Skip to main content

Homeowners: Apply for Foundation Awards

Foundations

Manufactured Home Improvement and Repair Program (MHIR) Deadlines

As of 3/17/25, applications for Home Repair, Infill, and Foundation Awards will be OPEN through May 15, 2025.

Emergency Home Repair applications will remain open past the closing date for households facing immediate housing loss due to repair needs. These applications will be subject to additional review to determine eligibility.

Need help with your application?

Manufactured Home Foundation Awards are available to prospective and current homeowners of manufactured homes in a park. Eligible applicants can receive up to $15,000 to cover costs related to installing a new permanent foundation or HUD-approved slab on a vacant lot. Projects must be approved before work begins. MHIR does not pay for retroactive work.  

Additional program requirements:

  • The home must be the primary residence of the homeowner.
  • Slabs must be HUD-approved with HUD-309 for new manufactured homes. 
  • Homeowners are responsible for meeting local regulations and home loan requirements.
  • The home must be located within a Mobile Home Park listed in the Registry of Vermont Mobile Home Parks.
Note: Projects must be approved before work begins. MHIR does not pay for retroactive work.

Essential Links

Checkbox with pencilHomeowner Application   Upload W9/Direct Deposit   Additional Forms


Eligible uses of Manufactured Home Foundation funds include:

  • Site preparation;
  • Skirting;
  • Tie-downs; and
  • Utility connections
  • Foundations for a manufactured home moving to a lot in a state registered park. 

Ineligible uses of Manufactured Home Foundation funds include:

  • Concrete slabs for propane tanks.

Application Assistance

To learn more about applying for Foundation or Home Repair Awards, watch our April 2023 MHIR Homeowner Webinar

Need help with your application?


Frequently Asked Questions

Prospective and current homeowners of manufactured homes that will be:

  1. The applicant’s primary residence located in Vermont;
  2. Located in a Mobile Home Park listed in the Registry of Vermont Mobile Home Parks; and
  3. On a HUD-approved mobile home slab or foundation.

MHIR will be taking applications from March 17, 2025 until May 15, 2025, or until available funding runs out, whichever comes first. When the standard application window is closed, applications for emergency home repairs – repairs which will prevent immediate loss of housing or habitability – will be accepted while separate funding is available. Foundation awards and infill will not be considered for emergencies.

Limit one award per applicant. Awards can be up to $15,000 to pay for a foundation or slab and related expenses within registered manufactured home communities.

No, this program does not require income eligibility, but homeowners must attest to their income in the application.

Applicants shall complete the application and upload supporting documentation through the online portal, which can be found at: https://mhirprogram.vsha.org/

For Home Repair application assistance, please contact CVOEO at:  (802) 660-3455 ext. 204 or mhp@cvoeo.org

Paper applications can be made available by request as a reasonable accommodation for disability or lack of access to the necessary technology and submitted by email to: mhirprogram@vsha.org  or by mailing to:

MHIR Program
VT State Housing Authority
One Prospect Street
Montpelier, VT 05602

*Please note that due to the increased processing time for paper applications, your eligibility determination, correspondence, and payments may be delayed.

No, this financial assistance is not taxable income for homeowners, and you will not receive a 1099 tax form.

  • At least 1 detailed quote from a contractor for the foundation installation and any associated work.
  • A detailed budget for the overall project or a pre-approval letter from your lender.
  • At least 1 photo of the lot where the home will be placed.
  • If applicable, a completed HUD Form 309 should be submitted by applicant or contractor following completion of foundation or slab.